Invitation to Bid
- Contracting of Services of 30 Private Security Agency Guards. January 19-27, 2009
- Construction of Motorpool. January 14-21, 2009
- Replacement of the Existing Flight Information Display System (FIDS) at
the Passenger Terminal Building.
- Renovation of Restrooms and Lockers at the CFR Building.
- Renovation of Security Office, Bldg 7535-Phase 2. November 21-28, 2008
- Supply, Installation, Testing and Commissioning of Window and Split
Type Air Conditioning System at ILS Shelters and Corporate Office Building. November 21-28, 2008
- Construction of Motorpool. November 21-28, 2008
- Construction of Car Park Shed. November 12-18, 2008
- Overlaying of Asphalt at COB, Blocker 3 and Taxiway Bravo. November 7-13, 2008
- Sealing of Joints at Runway 02R/20L. October 23-29, 2008
- Maintenance of 500 Hectares Sodded Airport Grounds. Oct 17 - Nov 5, 2008
- Supply, Delivery And Installation Of Sports Equipment For The Clark International Airport Corporation. Oct 13 - 21, 2008
- Disposal of CargoHaus Building (BLDG NO. 7550). Oct 6 - 10, 2008
- Disposal of Service Vehicles of the Clark International Airport Corporation. Sept. 26 - Oct. 03, 2008
- Supply and Delivery of Six (6) units AUV. Sept 18 - Oct 8, 2008
- Supply and Delivery of Company Service Vehicles. Sept 18 - Oct 8, 2008
- Sealing of Joints at Runway 02R/20L. Sept 12 - Oct 2, 2008
- The Supply And Delivery Of Computer Server,Desktop Computers, Laptop Computers And Hardware Peripherals For Clark International Airport Corporation. Sept 11 - Oct 1, 2008
- Removal and Re-painting of Deteriorated Pavement Markings at Runway, Taxiway and Apron. Sept 11 - Oct 2, 2008
- Contracting Of 42 Private Agency Security Guards. Aug 15 - Sept 15, 2008
- The Lease of a Dedicated, Uninterruptible and Unlimited Internet Connection with a Minimum Bandwidth of 2.0 Mbps for CIAC (Re-Bid). July 16 - July 25, 2008
- Removal of Aircraft Arrester Pad at Runway 02R/20L. July 8-29, 2008
- CIAC Group Life Insurance. June 20 - July 16, 2008
- Maintenance of 500 Hectares Sodded Airport Grounds. June 20 - July 21, 2008
- The Lease of a Dedicated, Uninterruptible and Unlimited Internet Connection with a Minimum Bandwidth of 2.0 Mbps for CIAC. June 17 - July 11, 2008
- CIAC Janitorial Services. June 17 - July 17, 2008
- Removal of Aircraft Arrester Pad at Runway 02R/20L. May 9 - June 3, 2008
- Improvement of President